Skip to content

All services

Services overview

Inspections and lightning protection all of Slovakia

Lightning protection inspection

Inspection of lightning protection on a family house, an apartment building or business premises: the whole system checked, the earthing measured at every down conductor, and a report within 3 working days of the measurement.

Scope

What it covers

01

Air termination and down conductors

On the roof we go over the air terminals and the conductors, on the facade the down conductors and their supports. We look for corrosion, loose joints and broken runs, and for anything that has crept close to a conductor over the years.

02

Measuring the earthing

At every down conductor we open the test joint and measure the earth resistance with a Metrel Eurotest, then the resistance of the joints. The values are compared with the last report: a rising resistance gives away a corroding electrode before it fails.

03

What the roof has gained

An aerial, a satellite dish, an air conditioner or solar panels added after the lightning protection often stand outside the protected zone or too close to a conductor. We assess them and propose how to bring them under protection.

04

The inspection report

The report holds the values measured at every down conductor, the defects from the most serious with how to put them right, and an overall assessment of the system. It arrives within 3 working days, as a signed PDF and on paper.

05

An extraordinary inspection

After a lightning strike, after the roof is repaired or replaced, and after insulation work that takes the down conductors off and puts them back, the system is checked before its interval is up. Only the report confirms it protects again.

06

An apartment building

Under § 2(5) of Act No. 182/1993 Coll., lightning protection is shared equipment of the building. The inspection on time is therefore ordered by the owners' association or the manager, not by the owner of one flat.

Indicative prices

What it costs

Lightning inspection, family house
Work Price incl. VAT
Up to 4 down conductors €220
5 to 8 down conductors €290
Lightning inspection, apartment building
Work Price incl. VAT
Up to 2 down conductors €80 per down conductor
3 to 7 down conductors €55 per down conductor
8 or more down conductors €45 per down conductor

The prices are indicative; we give the exact price before the inspection. Regular clients get 10 % off a repeat inspection. The prices of other work are in the price list.

Handed over

What you get

  1. [1] Earth resistance at every down conductor
  2. [2] The report within 3 working days
  3. [3] A list of defects with proposed measures
  4. [4] An e-mail reminder of the next inspection

Common questions

Questions about the inspection

How often is an inspection needed?

By protection level: levels I and II at least every 2 years, III and IV every 4 years, and a building with an area at risk of explosion every year — active lightning protection included. If the environment under Table B sets a shorter interval, the shorter one applies (Annex 8 of Decree No. 508/2009 Coll.). All the intervals are on the inspection intervals page.

Is the inspection mandatory?

On an apartment building, at a business and on premises, yes, at the interval the decree sets. § 13(7) of Act No. 124/2006 Coll. exempts a family house and a flat in personal ownership. We recommend it there too: after a strike, the report shows the lightning protection was working.

What does an inspection cost?

It depends on the number of down conductors: for a family house the price is for the whole house, for an apartment building per down conductor. Indicative prices are in the tables above, and we give the exact price before the inspection.

What if the system fails the inspection?

The defects go into the report with proposed measures, and we say which are urgent. We propose the repair within the price of the inspection or in a separate quote, and after it the follow-up inspection is free. If the system is outdated, we recommend modernising it.

Does a new system need an inspection too?

Yes. Before it is put into service an initial inspection verifies it, and when we fit it, its report comes with the handover. The periodic inspection then repeats at the interval of its protection level.

On their own

Also under this service

  1. 01 Inspections

    Lightning protection

Advice or a call-out

Need your installation checked?

0902 481 461

Tell us what is happening, or what needs inspecting. We agree the scope, the price and the next free date on the phone. If you cannot get through, we are on a job and will call you back.