01 Standards
STN standards
We test and hand over to STN 33 2000-6. We keep track of the standards and the inspection deadlines for you, and call before yours is up.
Inspection: STN 33 2000-6
Quotes itemised by labour and materials, inspection reports that propose how to fix defects, and a reminder when the next inspection is due.
Direct line If you cannot get through, we are on a job and will call you back.
Why us
01 Standards
We test and hand over to STN 33 2000-6. We keep track of the standards and the inspection deadlines for you, and call before yours is up.
Inspection: STN 33 2000-6
02 Costing
The quote arrives within five days and costs nothing. It itemises the labour and the materials, so you know what each part of the job costs before it starts.
Within 5 days free
03 Approach
We help you shape what you have in mind and draw it up. The budget and the bill of quantities let you compare contractors.
Design budget quantities
04 Schedule
Planned maintenance is the cheapest way to clear a fault. We order the materials in advance and do the work on the agreed date.
Materials ordered ahead
Where to start
Choose by the situation you are in — not by what it is called in a price list.
01 Inspections
Initial periodic lightning protection appliances
The next inspection is coming up, the building is up for approval, you are changing the main breaker, or the lightning protection needs inspecting.
Book an inspection
02 Wiring
Flats family houses apartment buildings business premises
You are renovating a flat, building a house, or your block of flats still has aluminium risers and a distribution board that remembers the eighties.
Request a quote
03 Security
Jablotron Hikvision IP and analogue cameras
You want to know what is happening at home or at work while you are away — an alarm that tells your phone and cameras that record.
Secure your property
04 Smart home
Lighting heating video intercoms RFID
A chip instead of a key at the entrance, a video intercom, a corridor light that switches itself on, and underfloor heating with a thermostat.
Ask about a solution
05 Photovoltaics
Supply fitting protection hot water
You want panels on a family house and would rather not assemble the job from several suppliers — we supply them, fit them and hand them over with an inspection report.
Request a quoteField record
Installing cable trays
Trays, labelled circuits and a distribution board you can still find your way around in ten years.
Technical data
§ 13
Decree 508/2009 Coll.
Professional inspections and tests of electrical installations and lightning protection at the intervals in § 13 and Annex 8. What a report contains is set by § 16(2).
STN / EN
33 2000-6 IEC 62305
Inspections of low-voltage installations to STN 33 2000-6, and protection of buildings against lightning and surges to the STN EN IEC 62305 series.
SK
Area
We work across Slovakia, most often here: Banská Bystrica, Selce, Zvolen, Sliač, Slovenská Ľupča, Brezno and the villages between them.
5 years
Periodic inspection
The interval for a masonry residential building — in an apartment building, for the communal areas and risers. Older installations, other buildings and environments can differ.
Intervals by buildingSupply system: TN-S, TN-C-S 3×400/230 V 50 Hz
Intervals: Decree 508/2009 Coll., Annex 8
Advice or a call-out
Need your installation checked?
0902 481 461Tell us what is happening, or what needs inspecting. We agree the scope, the price and the next free date on the phone. If you cannot get through, we are on a job and will call you back.