Skip to content

All services

Services overview

Electrician all of Slovakia

Installations
and inspections

Quotes itemised by labour and materials, inspection reports that propose how to fix defects, and a reminder when the next inspection is due.

Call 0902 481 461

Direct line If you cannot get through, we are on a job and will call you back.

Area
All of Slovakia
Trading since 2010
over 1 000 jobs completed
Warranty
5 years on the work done
Systems
Jablotron Hikvision Legrand Heatflow Fenix

Why us

A standard you can check

  1. 01 Standards

    STN standards

    We test and hand over to STN 33 2000-6. We keep track of the standards and the inspection deadlines for you, and call before yours is up.

    Inspection: STN 33 2000-6

  2. 02 Costing

    Itemised quote

    The quote arrives within five days and costs nothing. It itemises the labour and the materials, so you know what each part of the job costs before it starts.

    Within 5 days free

  3. 03 Approach

    We promise only what we can deliver

    We help you shape what you have in mind and draw it up. The budget and the bill of quantities let you compare contractors.

    Design budget quantities

  4. 04 Schedule

    The agreed date

    Planned maintenance is the cheapest way to clear a fault. We order the materials in advance and do the work on the agreed date.

    Materials ordered ahead

Field record

Installing cable trays

Trays, labelled circuits and a distribution board you can still find your way around in ten years.

Technical data

What we work by

  1. § 13

    Decree 508/2009 Coll.

    Professional inspections and tests of electrical installations and lightning protection at the intervals in § 13 and Annex 8. What a report contains is set by § 16(2).

  2. STN / EN

    33 2000-6 IEC 62305

    Inspections of low-voltage installations to STN 33 2000-6, and protection of buildings against lightning and surges to the STN EN IEC 62305 series.

  3. SK

    Area

    We work across Slovakia, most often here: Banská Bystrica, Selce, Zvolen, Sliač, Slovenská Ľupča, Brezno and the villages between them.

  4. 5 years

    Periodic inspection

    The interval for a masonry residential building — in an apartment building, for the communal areas and risers. Older installations, other buildings and environments can differ.

    Intervals by building

Supply system: TN-S, TN-C-S 3×400/230 V 50 Hz

Intervals: Decree 508/2009 Coll., Annex 8

Advice or a call-out

Need your installation checked?

0902 481 461

Tell us what is happening, or what needs inspecting. We agree the scope, the price and the next free date on the phone. If you cannot get through, we are on a job and will call you back.