Skip to content

All services

Services overview

Service 02 all of Slovakia

Flats family houses apartment buildings business premises

Electrical installations

Complete electrical installations for flats, family houses, shops, office and industrial buildings. Before we rework old wiring, we check its condition.

When you need it

When to rewire

  1. 02.01 · Renovation

    Flats and family houses

    You are redoing the kitchen, the bathroom or the whole flat. Aluminium is a risky material in wiring; new circuits are copper, three-core and protected by a residual current device.

    Outcome New circuits, consumer unit, inspection report

  2. 02.02 · New build

    From design to meter

    Complete wiring to the design, the supply cable and the meter board, with provision for low-voltage systems and a heat pump.

    Outcome An installation ready to be connected

  3. 02.03 · Apartment building

    Risers and communal wiring

    Aluminium risers, meter boards and lighting in the communal areas. Entrance by entrance and in stages, with every power cut announced in advance.

    Outcome Copper wiring, new boards, documentation

Scope

What it includes

01

Flats and family houses

Complete wiring for a new build, and renovation in an occupied flat. Socket and lighting circuits, the consumer unit, provision for appliances and low-voltage wiring.

02

Apartment buildings and risers

Replacement of aluminium riser wiring and communal distribution boards. We work entrance by entrance and in stages, with every power cut announced in advance.

03

Business premises and offices

Retail premises, offices and workshops, including structured cabling, emergency lighting and wiring for equipment.

04

Quote and design

Materials and labour listed separately, item by item. We prepare as-built documentation wherever building approval or the distribution operator requires it.

Outcome

Installation handed over

What you hold in your hand when we leave. Four things you can check without us.

  1. [1] Itemised quote: materials and labour separately, with no “other” line
  2. [2] Distribution board with labelled circuits and the wiring diagram inside the door
  3. [3] Initial inspection report at handover
  4. [4] As-built documentation when building approval or the distribution operator requires it

Common questions

Questions about wiring

Do you also fit electric underfloor heating?

Yes, and it is not one thing but three, for three different floors. Heating foil goes under a floating floor and adds almost no height. Cable in screed is poured in and suits a renovation where the floor is being rebuilt anyway. Self-regulating cable changes its output with temperature, so it cannot overheat. Which is right is decided by the build-up of the floor and whether it should heat the room or merely take the chill off it.

Can a staircase or a drive be heated?

Yes, we do de-icing of steps and outdoor surfaces. A heating cable is laid into the surface and switched by a thermostat with a moisture and temperature sensor, so the system runs only when it is actually freezing and wet — not all winter. The running cost rests on that switching.

Does a new installation need an inspection?

Yes. An initial inspection and test is carried out before the installation is put into use; without that report the installation is not documented as safe, and in an insurance claim or an inspection it tends to be the first document somebody asks for. We do both, so you are not left arbitrating between two firms about who measured what.

What is surge protection and do I need it?

It is a set of devices in the distribution board that diverts a surge to earth before it reaches the appliances. It protects against lightning striking the supply line and against switching spikes in the network, and with electronics — a boiler, a control unit, network equipment — it tends to be the difference between a small repair and a replacement. It is added when a board is replaced, because at that moment it is an hour of extra work rather than a day.

How long will we be without power?

Replacing a flat's distribution board is a matter of hours rather than days, and it is done so that the flat has power overnight. A full rewire is split into stages and part of the circuits stays live. We say exactly what will be off and when at the survey — it is something to plan for, not to discover on the morning.

Why is old aluminium wiring a risk?

Aluminium has low mechanical strength and oxidises easily. Under the pressure of a terminal screw an aluminium conductor deforms over time, the joint conducts worse, heats up and can start a fire. What of the old wiring can stay is for an electrician to judge — expect it not to be much.

How many sockets does a kitchen need?

Plan sockets for the fridge and freezer, the cooker or oven, the microwave, the dishwasher and possibly an instantaneous water heater at the sink — that is five separately protected circuits. A sixth socket circuit serves other appliances, about ten sockets in all. Think of appliances you do not have yet, too.

When does a consumer unit need replacing?

Breakers thirty years old and more may no longer do their job: on a fault or an overload they do not trip, the conductors heat up, and a socket or lighting connection can start a fire. We see it regularly, and replacing the consumer unit is the first step that stops it happening.

Do you run data and television cabling as well?

Yes, and we run it together with the power, while the walls and floors are still open — pulling it later means chasing them again. Where it goes belongs in the design: where the network sockets are, which way the television cabling runs, and where the cabinet everything comes back to will sit. The same thought covers cameras and a video intercom, which run on data cable too.

Can you help design it before I pick a firm?

Yes. We help you shape what you have in mind and draw it up; the budget and bill of quantities for the electrical work help you compare contractors’ quotes.

Advice or a call-out

Need your installation checked?

0902 481 461

Tell us what is happening, or what needs inspecting. We agree the scope, the price and the next free date on the phone. If you cannot get through, we are on a job and will call you back.